{"id":179701,"date":"2026-08-13T07:23:00","date_gmt":"2026-08-13T05:23:00","guid":{"rendered":"https:\/\/renewable-carbon.eu\/news\/?p=179701"},"modified":"2026-08-06T10:43:46","modified_gmt":"2026-08-06T08:43:46","slug":"first-hydrogen-from-lingen-reaches-customer","status":"publish","type":"post","link":"https:\/\/renewable-carbon.eu\/news\/first-hydrogen-from-lingen-reaches-customer\/","title":{"rendered":"First hydrogen from Lingen reaches customer"},"content":{"rendered":"\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1000\" height=\"667\" src=\"https:\/\/renewable-carbon.eu\/news\/media\/2026\/08\/large_Aug_26_First_hydrogen_from_Lingen_reaches_customer_ppe_group_shot_ec49d3a36c.jpg\" alt=\"\" class=\"wp-image-179719\" style=\"width:718px;height:auto\" srcset=\"https:\/\/renewable-carbon.eu\/news\/media\/2026\/08\/large_Aug_26_First_hydrogen_from_Lingen_reaches_customer_ppe_group_shot_ec49d3a36c.jpg 1000w, https:\/\/renewable-carbon.eu\/news\/media\/2026\/08\/large_Aug_26_First_hydrogen_from_Lingen_reaches_customer_ppe_group_shot_ec49d3a36c-300x200.jpg 300w, https:\/\/renewable-carbon.eu\/news\/media\/2026\/08\/large_Aug_26_First_hydrogen_from_Lingen_reaches_customer_ppe_group_shot_ec49d3a36c-150x100.jpg 150w, https:\/\/renewable-carbon.eu\/news\/media\/2026\/08\/large_Aug_26_First_hydrogen_from_Lingen_reaches_customer_ppe_group_shot_ec49d3a36c-768x512.jpg 768w, https:\/\/renewable-carbon.eu\/news\/media\/2026\/08\/large_Aug_26_First_hydrogen_from_Lingen_reaches_customer_ppe_group_shot_ec49d3a36c-400x267.jpg 400w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><figcaption class=\"wp-element-caption\">\u00a9 ITM Power<\/figcaption><\/figure><\/div>\n\n\n<p><strong>ITM Power plc is pleased to announce a major milestone for the GET H2 Nukleus hydrogen project: the successful production and delivery of initial quantities of green hydrogen from RWE\u2019s electrolysis plant in Lingen, Germany. In total, ITM Power and Linde Engineering are delivering two 100 MW plants to RWE in Lingen.<\/strong><\/p>\n\n\n\n<p>As part of the ongoing commissioning process, green hydrogen has been successfully produced and transported via approximately 120 km of hydrogen pipeline infrastructure for usage at Evonik\u2019s chemical park in Marl. This demonstrates the integration of large-scale hydrogen production, transport and industrial offtake, marking one of the first operational hydrogen value chains in Europe.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p><strong>Dennis Schulz, CEO of ITM Power<\/strong>, said: \u201cThis is a landmark achievement for the hydrogen industry and a proud moment for ITM Power. We are delighted to see our technology operating at unprecedented scale, helping to power one of Europe&#8217;s first integrated hydrogen value chains.<\/p>\n\n\n\n<p>The project demonstrates the maturity of large-scale PEM electrolysis. We congratulate all project partners on reaching this important milestone, and we look forward to supporting the project&#8217;s continued ramp-up towards full 200 MW commercial operation.\u201d<\/p>\n<\/blockquote>\n\n\n\n<div style=\"height:17px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>About ITM Power plc<\/strong><\/h3>\n\n\n\n<p>ITM Power designs and manufactures industrial-scale electrolysers for green hydrogen production. Its proprietary PEM technology, vertically integrated manufacturing, and in-house engineering capabilities enable it to supply standardised, high-performance hydrogen plants.<\/p>\n\n\n\n<p>With a proven track record in large-scale projects, ITM Power helps leading industrial and energy companies achieve their decarbonisation goals. In addition to its equipment offering, the company provides reliable and cost-competitive hydrogen supply through its build, own and operate (BOO) model, Hydropulse.<\/p>\n\n\n\n<p>Headquartered in the UK, ITM Power is listed on the London Stock Exchange AIM (LSE: ITM) and holds the Green Economy Mark, which recognises companies that generate over 50% of their revenues from green products and services.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>ITM Power plc is pleased to announce a major milestone for the GET H2 Nukleus hydrogen project: the successful production and delivery of initial quantities of green hydrogen from RWE\u2019s electrolysis plant in Lingen, Germany. In total, ITM Power and Linde Engineering are delivering two 100 MW plants to RWE in Lingen. As part of [&#8230;]<\/p>\n","protected":false},"author":59,"featured_media":179719,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"none","nova_meta_subtitle":"A major milestone for the GET H2 Nukleus hydrogen project: the successful production and delivery of initial quantities of green hydrogen from RWE\u2019s electrolysis plant in Lingen","footnotes":""},"categories":[5572],"tags":[5714,10416,26017,10630,5528],"supplier":[10935,3195,839],"class_list":["post-179701","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-bio-based","tag-biofuels","tag-circulareconomy","tag-electrolyse","tag-hydrogen","tag-sustainability","supplier-itm-power-gmbh","supplier-linde-engineering-dresden-gmbh","supplier-rwe-ag"],"_links":{"self":[{"href":"https:\/\/renewable-carbon.eu\/news\/wp-json\/wp\/v2\/posts\/179701","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/renewable-carbon.eu\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/renewable-carbon.eu\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/renewable-carbon.eu\/news\/wp-json\/wp\/v2\/users\/59"}],"replies":[{"embeddable":true,"href":"https:\/\/renewable-carbon.eu\/news\/wp-json\/wp\/v2\/comments?post=179701"}],"version-history":[{"count":2,"href":"https:\/\/renewable-carbon.eu\/news\/wp-json\/wp\/v2\/posts\/179701\/revisions"}],"predecessor-version":[{"id":179744,"href":"https:\/\/renewable-carbon.eu\/news\/wp-json\/wp\/v2\/posts\/179701\/revisions\/179744"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/renewable-carbon.eu\/news\/wp-json\/wp\/v2\/media\/179719"}],"wp:attachment":[{"href":"https:\/\/renewable-carbon.eu\/news\/wp-json\/wp\/v2\/media?parent=179701"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/renewable-carbon.eu\/news\/wp-json\/wp\/v2\/categories?post=179701"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/renewable-carbon.eu\/news\/wp-json\/wp\/v2\/tags?post=179701"},{"taxonomy":"supplier","embeddable":true,"href":"https:\/\/renewable-carbon.eu\/news\/wp-json\/wp\/v2\/supplier?post=179701"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}