{"id":172607,"date":"2026-01-26T07:35:00","date_gmt":"2026-01-26T06:35:00","guid":{"rendered":"https:\/\/renewable-carbon.eu\/news\/?p=172607"},"modified":"2026-01-26T07:43:45","modified_gmt":"2026-01-26T06:43:45","slug":"fortum-produces-first-hydrogen-at-kalla-test-center","status":"publish","type":"post","link":"https:\/\/renewable-carbon.eu\/news\/fortum-produces-first-hydrogen-at-kalla-test-center\/","title":{"rendered":"Fortum produces first hydrogen at Kalla Test Center"},"content":{"rendered":"\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"384\" src=\"https:\/\/renewable-carbon.eu\/news\/media\/2026\/01\/New20brand20logo_small_JPG-2-1024x384.webp\" alt=\"\" class=\"wp-image-172609\" style=\"width:650px\" srcset=\"https:\/\/renewable-carbon.eu\/news\/media\/2026\/01\/New20brand20logo_small_JPG-2-1024x384.webp 1024w, https:\/\/renewable-carbon.eu\/news\/media\/2026\/01\/New20brand20logo_small_JPG-2-300x113.webp 300w, https:\/\/renewable-carbon.eu\/news\/media\/2026\/01\/New20brand20logo_small_JPG-2-150x56.webp 150w, https:\/\/renewable-carbon.eu\/news\/media\/2026\/01\/New20brand20logo_small_JPG-2-768x288.webp 768w, https:\/\/renewable-carbon.eu\/news\/media\/2026\/01\/New20brand20logo_small_JPG-2-1536x576.webp 1536w, https:\/\/renewable-carbon.eu\/news\/media\/2026\/01\/New20brand20logo_small_JPG-2-400x150.webp 400w, https:\/\/renewable-carbon.eu\/news\/media\/2026\/01\/New20brand20logo_small_JPG-2.webp 2000w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">\u00a9 Fortum<\/figcaption><\/figure><\/div>\n\n\n<p><strong>Fortum has succeeded in producing first hydrogen at Kalla Test Center in Loviisa, Finland, during the first phases of the commissioning of the electrolyzer equipment. The test center is expected to be fully operational during spring 2026. Fortum is committed to accelerating electrification across the Nordics, and the Kalla Test Center will contribute to that goal.<\/strong><\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p>\u201cThis first hydrogen from Kalla is a tangible step from vision to reality and a significant milestone for Fortum and its ambition to explore hydrogen\u2019s potential in decarbonising Nordic industries. We are gaining the technical and commercial experience needed to scale renewable hydrogen and drive the Nordic decarbonisation,\u201d says&nbsp;<strong>Satu Sipola<\/strong>, VP P2X and Project Execution at Fortum.<\/p>\n<\/blockquote>\n\n\n\n<p>Fortum\u2019s approach focuses on building technical readiness and commercial viability one step at a time \u2014 Kalla is a technical pilot allowing us to proceed with possible larger projects supporting industrial customers needs.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Testing with two types of electrolysers<\/h3>\n\n\n\n<p>Hydrogen at Kalla is produced through electrolysis \u2014 splitting water into hydrogen and oxygen using fossil-free electricity. Hydrogen acts as an energy carrier that can store and transport energy without producing CO\u2082 when used, making it valuable where direct electrification is not possible.<em><\/em>Two electrolyser technologies integrated into one plant are being commissioned in phases.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>1 MW alkaline electrolyser from Stargate Hydrogen<\/li>\n\n\n\n<li>0.75 MW PEM electrolyser from Hystar<\/li>\n<\/ul>\n\n\n\n<p>Operating both systems under real conditions provides valuable insights into efficiency, flexibility, safety and scalability.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Hydrogen delivered to industrial customer<\/h3>\n\n\n\n<p>The Kalla Test Center will operate as a learning and development platform through 2028. The findings will help shape Fortum\u2019s possible commercial-scale hydrogen projects and future customer solutions.<\/p>\n\n\n\n<p>Hydrogen from Kalla will be delivered to P2X Solutions Oy through an existing agreement. Part of the hydrogen will also be used for research and development as well as at Fortum\u2019s Loviisa nuclear power plant.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Fortum has succeeded in producing first hydrogen at Kalla Test Center in Loviisa, Finland, during the first phases of the commissioning of the electrolyzer equipment. The test center is expected to be fully operational during spring 2026. Fortum is committed to accelerating electrification across the Nordics, and the Kalla Test Center will contribute to that [&#8230;]<\/p>\n","protected":false},"author":114,"featured_media":172609,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"none","nova_meta_subtitle":"The test center is expected to be fully operational during spring 2026 and is committed to accelerating electrification across the Nordics","footnotes":""},"categories":[5571],"tags":[10744,10416,16636,10630,15938,10743],"supplier":[6150,25174],"class_list":["post-172607","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-co2-based","tag-carboncapture","tag-circulareconomy","tag-electrolysers","tag-hydrogen","tag-powertox","tag-useco2","supplier-fortum-corporation","supplier-stargate-hydrogen-solutions-ou"],"_links":{"self":[{"href":"https:\/\/renewable-carbon.eu\/news\/wp-json\/wp\/v2\/posts\/172607","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/renewable-carbon.eu\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/renewable-carbon.eu\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/renewable-carbon.eu\/news\/wp-json\/wp\/v2\/users\/114"}],"replies":[{"embeddable":true,"href":"https:\/\/renewable-carbon.eu\/news\/wp-json\/wp\/v2\/comments?post=172607"}],"version-history":[{"count":0,"href":"https:\/\/renewable-carbon.eu\/news\/wp-json\/wp\/v2\/posts\/172607\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/renewable-carbon.eu\/news\/wp-json\/wp\/v2\/media\/172609"}],"wp:attachment":[{"href":"https:\/\/renewable-carbon.eu\/news\/wp-json\/wp\/v2\/media?parent=172607"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/renewable-carbon.eu\/news\/wp-json\/wp\/v2\/categories?post=172607"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/renewable-carbon.eu\/news\/wp-json\/wp\/v2\/tags?post=172607"},{"taxonomy":"supplier","embeddable":true,"href":"https:\/\/renewable-carbon.eu\/news\/wp-json\/wp\/v2\/supplier?post=172607"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}