{"id":16213,"date":"2013-01-07T00:00:00","date_gmt":"2013-01-06T22:00:00","guid":{"rendered":"http:\/\/www.bio-based.eu\/news\/index.php?startid=20130107-04n"},"modified":"2013-01-07T00:00:00","modified_gmt":"2013-01-06T22:00:00","slug":"worlds-largest-cfb-biomass-power-plant-now-in-commercial-operation-using-foster-wheeler-advanced-technology","status":"publish","type":"post","link":"https:\/\/renewable-carbon.eu\/news\/worlds-largest-cfb-biomass-power-plant-now-in-commercial-operation-using-foster-wheeler-advanced-technology\/","title":{"rendered":"World\u2019s Largest CFB Biomass Power Plant Now in Commercial Operation Using Foster Wheeler Advanced Technology"},"content":{"rendered":"<p><b>Foster Wheeler AG announced today that the GDF Suez power plant located in Polaniec, Poland, is now in commercial operation, delivering over 200 MWe of electricity to the country\u2019s electricity grid solely from biomass.<\/b><\/p>\n<p>The plant is powered by the world\u2019s largest and most advanced biomass CFB (circulating fluidized-bed) boiler, which was supplied by Foster Wheeler. CFB technology is capable of fully firing a wide range of biomasses and other fuels, including those derived from agricultural crops. &#8220;Agro\u201d biomass can be produced much faster and on a larger scale than longer growth wood-based biomasses, thus improving the economics and sustainability of biomass power.<\/p>\n<p>&#8220;The challenge has always been to design a boiler capable of reliably firing difficult-to-burn agro biomass while at the same time increasing steam temperatures to achieve high power plant efficiency,\u201d said Jaroslaw Mlonka, President and Chief Executive Officer of Foster Wheeler Energia Polska. &#8220;This particular CFB incorporates many advanced design features that enable the Polaniec plant to achieve a net plant efficiency of over 36%, based on the fuels lower heating value, while firing solely biomass containing up to a 20% agro component.\u201d<\/p>\n<p>Mlonka further stated, &#8220;This Advanced Bio CFB &#8212; or ABC &#8212; is the largest and most advanced biomass CFB steam generator Foster Wheeler has ever supplied. Our goal for this project was to provide GDF Suez with a reliable, biomass-flexible boiler that would allow the client to build a high-efficiency green power plant \u2013 and we have achieved that objective.\u201d<\/p>\n<p>The Polaniec plant is owned and operated by GDF Suez, one of the leading energy producers in the world. The plant began commercial operation on November 15, 2012, six weeks ahead of schedule. Foster Wheeler provided a turnkey delivery of the boiler island and fuel yard, including design and supply of all steam generation and auxiliary equipment, civil work, erection and commissioning.<\/p>\n<p><b><i>About Foster Wheeler AG:<\/i><\/b><br \/>Foster Wheeler AG is a global engineering and construction company and power equipment supplier delivering technically advanced, reliable facilities and equipment. The company employs approximately 12,000 talented professionals with specialized expertise dedicated to serving its clients through one of its two primary business groups. The company\u2019s Global Engineering and Construction Group designs and constructs leading-edge processing facilities for the upstream oil and gas, LNG and gas-to-liquids, refining, chemicals and petrochemicals, power, mining and metals, environmental, pharmaceuticals, biotechnology and healthcare industries. The company\u2019s Global Power Group is a world leader in combustion and steam generation technology that designs, manufactures and erects steam generating and auxiliary equipment for power stations and industrial facilities and also provides a wide range of aftermarket services. The company is based in Zug, Switzerland, and its operational headquarters office is in Geneva, Switzerland.<\/p>\n","protected":false},"excerpt":{"rendered":"<p><b>Foster Wheeler AG announced today that the GDF Suez power plant located in Polaniec, Poland, is now in commercial operation, delivering over 200 MWe of<\/b><\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"","nova_meta_subtitle":"","footnotes":""},"categories":[5572],"tags":[],"supplier":[4328,4329],"class_list":["post-16213","post","type-post","status-publish","format-standard","hentry","category-bio-based","supplier-foster-wheeler-ag","supplier-gdf-suez"],"_links":{"self":[{"href":"https:\/\/renewable-carbon.eu\/news\/wp-json\/wp\/v2\/posts\/16213","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/renewable-carbon.eu\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/renewable-carbon.eu\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/renewable-carbon.eu\/news\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/renewable-carbon.eu\/news\/wp-json\/wp\/v2\/comments?post=16213"}],"version-history":[{"count":0,"href":"https:\/\/renewable-carbon.eu\/news\/wp-json\/wp\/v2\/posts\/16213\/revisions"}],"wp:attachment":[{"href":"https:\/\/renewable-carbon.eu\/news\/wp-json\/wp\/v2\/media?parent=16213"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/renewable-carbon.eu\/news\/wp-json\/wp\/v2\/categories?post=16213"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/renewable-carbon.eu\/news\/wp-json\/wp\/v2\/tags?post=16213"},{"taxonomy":"supplier","embeddable":true,"href":"https:\/\/renewable-carbon.eu\/news\/wp-json\/wp\/v2\/supplier?post=16213"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}